Skip to content

Three-Phase Motor Starter Wiring Diagram: Read the Power and Control Circuits

Read a three-phase DOL motor starter diagram from mains to motor and from START to the coil. Follow the TeSys LE power, holding and overload paths.

  • Mason Alexander
  • Published Nov 26, 2026
  • 5 min read
ABB panel photo next to a single-line drawing identifying KM1 as the main contactor and FR1 as the overload relay.

A three-phase direct-on-line (DOL) starter drawing shows two paths. The power circuit carries motor current through the contactor and overload elements. The control circuit energizes the contactor coil and determines when it drops out. Start by finding the same device tag on both drawings. In Schneider Electric's TeSys LE1D09…D65A example, KM1 is printed at the three main contacts, at the A1/A2 coil, and at an auxiliary contact used to keep the coil energized after START is released. 1

ABB panel photo next to a single-line drawing identifying KM1 as the main contactor and FR1 as the overload relay.
ABB maps the main contactor KM1 and overload relay FR1 from the physical assembly to the single-line drawing.

ABB's photo and single-line diagram show how to identify the contactor and overload relay in an assembled starter. The two TeSys diagrams below then show how those devices appear on separate power and control drawings. 5

Follow the power circuit from L1, L2 and L3 to the motor

Schneider TeSys LE1D power diagram with L1, L2 and L3 passing through KM1 main contacts and overload elements to U, V and W.
Start at L1, L2 and L3 and trace each conductor through KM1 and the overload sensing elements to U, V and W.

On the TeSys drawing, follow L1, L2 and L3 down through the three KM1 contacts and the overload elements to U, V and W. The three main contacts move together when the coil operates. The overload elements carry motor current. The associated control contact opens the coil circuit on a trip, so KM1 releases and all three main contacts open. 12

Check the installation's complete drawing for the disconnect, branch short-circuit protection and protective-earth connection. The TeSys catalog sketch depicts the enclosed starter circuit. Those additional functions have to be identified in the panel documentation. If choosing a DOL arrangement with an ABB MS116-10 and an ABB AF26-30-00-13 contactor, the manual motor starter provides thermal-magnetic protection in ABB's coordinated combination. That differs from the TeSys example with a separate overload relay. Check the exact parts and control accessories on the machine before transferring terminal numbers. The short-circuit selectivity guide explains the separate question of how protective devices coordinate. 3

The motor starter versus contactor comparison shows how to identify each device in these two starter arrangements and which specifications matter when replacing it.

Follow the control circuit from A to B

Schneider TeSys LE1D control diagram with supply points A and B, stop and overload path, start control, KM1 holding contact, and A1/A2 coil.
Read A to B. The stop and overload path is in series. The KM1 auxiliary contact is in parallel with START, above the A1/A2 coil.

A and B are the control supply points in this manufacturer drawing. A1 and A2 are the coil terminals. For example, Schneider lists the LE1D09P7 enclosed starter at 4 kW on a 400 V motor supply with a 230 V AC coil. 4 The motor and coil ratings answer different questions. The connection table beneath the TeSys schematic shows different A/B supply connections for different coil voltages. Identify the exact coil code, its voltage rating, and the source providing control power before following A and B. 1

In a conventional three-wire start/stop circuit, the normally closed stop and overload path permits the coil to energize. Pressing the momentary START closes the initial path to the coil. The normally open KM1 auxiliary contact then closes across START and holds the coil on. Releasing START opens the button path while the auxiliary path remains closed. Opening the stop or overload path drops the coil and opens the auxiliary contact, so the circuit resets to its idle state. 12

Observe the circuitCoil and contactsWhat this tells you on the drawing
Ready, START releasedCoil released. Main contacts and the holding contact are shown open.The stop and overload path may be intact while the start path is still open.
START pressedCoil picks up. Main contacts and the holding contact close.Find the START path and its parallel holding branch.
START releasedCoil stays energized through the holding contact.The KM1 auxiliary contact bridges the momentary START path.
STOP applied or overload tripsCoil drops out. Main and holding contacts open.Follow the interruption in series with the coil. Restoring the circuit prepares it for another start.

Schneider's local TeSys LE stop arrangement can use an enclosure plunger that operates the overload's stop mechanism. The catalog also shows variants with remote control. Read the variant used on the installed unit before treating the local stop symbol as a separate wired pushbutton. Schneider's TeSys D examples use auxiliary numbering 13–14 for a normally open holding contact and 95–96 for the normally closed overload trip contact. Verify the numbers on the exact device. 12

A star-delta starter circuit adds separate star and delta coils, a timed changeover and interlocks. Trace those branches by their function, as you did with the single KM1 coil here.

After identifying the trip contact on the control drawing, use the thermal overload relay selection guide to check the current setting, trip class and reset mode of the device operating it.

Use the diagram to localize the fault

SymptomFirst part of the diagram to checkEvidence that separates the causes
KM1 does not pick upController permissives, control supply, STOP and overload path, START and the coil.Establish whether the coil receives its rated control voltage during the start command using the machine's approved diagnostic procedure.
KM1 drops out when START is releasedHolding contact and its parallel path.Identify whether the specified auxiliary contact closes with KM1 and whether that contact actually completes the holding path.
KM1 holds but the motor does not turnPower supply, upstream protection, all three main poles, overload elements and motor leads.Coil operation establishes a control result. The three-phase power path still has to be verified.
The overload trips during accelerationActual motor current, motor connection, load and acceleration time.Compare the documented setting and trip class with the nameplate and operating conditions. Verify all phases and the driven load before changing protection settings.

Follow the machine isolation and commissioning procedures. Verify absence of voltage before inspecting or altering a circuit, including a separate control supply. Use the manufacturer's safety circuit and restart design for the installed machine. A process STOP on a DOL starter drawing does not establish the machine's emergency-stop function. 2

Check the replacement against both drawings

  1. Read the entire starter and coil order codes. Record the motor's current, supply voltage and the control supply's type and voltage.
  2. Identify the protection on the power path. Confirm whether overload protection is separate or integrated, and match the installed scheme and tested device combination.
  3. Verify the auxiliary contacts. The main poles may look identical across variants even when the replacement has a different auxiliary contact arrangement. Check the part number and trace the required stop and holding paths before accepting it.
  4. Verify the approved start, stop, trip and restart behavior with the machine's commissioning procedure. If DOL itself is unsuitable for the load or the available supply, use the three-phase motor starter selection guide to compare star-delta and soft starting.

References

  1. TeSys Control enclosed switch-disconnectors and motor starters

    Schneider Electric

  2. How to wire a contactor and an overload as a DOL starter

    Schneider Electric · FA139744

  3. 400 V DOL normal-start coordination table, MS116 and AF contactors

    ABB

  4. TeSys LE LE1D09P7 enclosed DOL starter

    Schneider Electric

  5. Softstarter Handbook

    ABB · 1SFC132060M0201