Read a three-phase VFD drawing in two passes. First trace the power from the supply, through the drive and out to the motor. Then trace the low-voltage signals that tell the drive when to run and what speed to request. The drawings below use the ABB ACS580-01-07A3-4, frame R1, and the ABB Standard macro. The terminal functions shown apply to this example and should be checked against the installed drive and its active settings. 123
Trace the incoming supply and the motor output
ABB labels the supply terminals L1, L2 and L3. The motor goes on T1/U, T2/V and T3/W. PE is the protective-earth connection on both sides. Follow those labels across the diagram before comparing cable tags or terminal positions. When replacing a drive, confirm the complete model and frame from the label. Models in the same family can have different terminal layouts. 12

| On the drawing | What it does | What to check |
|---|---|---|
| L1, L2, L3 | Incoming three-phase supply to the drive | Supply voltage class, phase count and approved line-side protection |
| T1/U, T2/V, T3/W | Variable-frequency output to the motor | Motor cable destination and winding connection for the intended voltage |
| PE and the cable shields | Protective-earth and EMC connections | Required PE conductors and the manufacturer’s shield terminations at the drive and motor |
| R− and UDC+/R+ on this R1 design | Optional brake resistor connection | Applicable frame, braking requirement and manufacturer’s resistor and protection instructions |
The cable drawing calls out PE continuity and shield termination separately. The motor cable screen is bonded around its circumference at the cabinet and motor ends as shown, and its suitability as a protective-earth conductor depends on the installation requirements. The power-terminal illustration below shows the physical separation of the input and output groups. An extra terminal beside them may belong to the brake circuit. Use the markings rather than tracing by proximity. 12

On this ACS580-01-07A3-4, the supply-side protection comes from the drive’s own installation or coordination data. A DOL panel drawing can help you recognize the old line-side devices, but the VFD’s output and switching requirements change the retrofit. If a safety switch, contactor or bypass is retained between the drive and motor, use the switching sequence permitted by the manufacturer. In ABB’s vector control example with ramp stop, the motor must come to zero speed before the output contactor opens. ABB’s bypass example also uses interlocking to keep the drive and line paths from closing together. See the DOL power and control drawing to identify which part of the original circuit you are looking at. 123
The VFD fault troubleshooting guide shows how an input or output phase-loss code points to a different side of this drawing.
Separate the run command from the speed request
ABB’s Standard macro drawing puts two different kinds of commands on adjacent terminal blocks. The digital start input asks the drive to run. The analog input asks for a speed or frequency reference through the selected control mode. A valid reference can exist while the motor is stopped. A valid run command can also be present while the drive is using a different reference source than the one shown in the cabinet drawing. 14


| Signal in the ABB Standard macro | Example connection | How to read it |
|---|---|---|
| Analog speed or frequency reference | X1:2 AI1 and X1:3 AGND | The default shown is 0–10 V. Read the signal relative to the analog common. |
| Potentiometer reference supply | X1:4 +10V | In the drawn potentiometer circuit this supplies the fixed end. The wiper feeds AI1 and the other fixed end returns to AGND. |
| Digital start request | X2/X3:13 DI1 | The default shown is stop at 0 and start at 1. Check the selected macro and command source if the cabinet differs. |
| Digital supply and common | X2/X3:10 +24V, :11 DGND and :12 DCOM | The source drawing identifies the auxiliary supply return and the common for the digital inputs. Verify how the installed supply and input circuit are referenced. |
The +10 V terminal belongs to the potentiometer example. For a PLC voltage output, identify the output signal and its return on the PLC diagram and check that the drive input is set for the voltage range being sent. If the project specifies 4–20 mA, verify which input accepts current, its input mode, the loop supply and the scaling. The drawing’s default AI1 example is a voltage input. 14
Verify the two paths before a first run
- Identify the exact drive and the applicable diagram. Before working on terminals, have qualified personnel isolate every relevant power source, allow the specified discharge time and verify absence of voltage using the ABB electrical-safety procedure. A stop command or active STO indication does not electrically isolate the drive. 12
- Compare cable tags with terminal markings. Trace supply to L1/L2/L3, the motor cable to T1/U–T3/W, and the PE and shield connections to the points shown for the frame. Confirm the motor’s winding links for the intended output voltage. If the supply, motor rating or winding connection is unresolved, return to the VFD sizing guide. 12
- Check the control settings against the installed wires. Identify the active control location and the selected start and reference sources. With the machine secured for commissioning, read the drive’s input status and reference display to confirm that the intended command and speed signal each arrive. Verify motor direction and the response to a stop command under the site’s commissioning procedure. 14
If the keypad operates the drive but a PLC command does not, compare what the drive sees on DI1 with the start source selected in remote mode. If the drive accepts the run command but follows the wrong speed, compare the displayed reference with the intended AI1 signal and scaling. Keeping those checks separate narrows the cause without moving wires just to see whether the motor turns. 4
For the corresponding ABB settings, the VFD commissioning guide maps the DI1 command and AI1 reference to the parameters, then walks through the checks for the first local and remote run.
References
- ACS580-01 Quick Installation and Start-up Guide for Global IEC Product Types
ABB · 3AXD50001317799 Rev B
- ACS580-01 Drives Hardware Manual, Frames R1–R9
ABB · 3AXD50000044794 Rev G
- ACS580-01-07A3-4, 3AXD50000038951
ABB
- ACS580 Standard Control Program Firmware Manual
ABB · 3AXD50000016097
